SALIENT TECHNICAL FEATURES |
|
Type |
Concrete Paved |
Length |
165.537 Km |
Right of Way (ROW) |
100 m |
Number of Lanes |
6 Lanes (extendable to 8) |
Lane Width |
3.75m each |
Top Width of Embankment |
47.60 Mtr. (including 6.0 Mtr. wide Median) |
Height of Embankment |
1.50 to 7.0 Mtr. (varying) |
NUMBER OF STRUCTURES |
|
Interchange |
6 Nos. |
Main Toll Plaza |
3 Nos (32 lanes at each location, extendable up to 52 lanes) |
Ramp Plaza |
8 Nos |
Vehicular Underpass |
70 Nos |
Minor Bridge |
41 Nos |
Cart Track Crossing |
76 Nos |
Culvert |
183 Nos |
PRINCIPAL QUANTITIES EXECUTED |
|
Earthwork including Fly Ash |
411.1 Lac Cum |
Concrete |
33.2 Lac Cum |
MAJOR RAW MATERIAL CONSUMED |
|
Cement |
12.0 Lac Tonnes |
Steel |
1.30 Lac Tonnes |
Stone Aggregate |
130 Lac Tonnes |
Admixtures |
12,500 tonnes |
Bitumen |
7,500 tonnes |
LANDSCAPING |
|
Shrubs Planted |
5 Lac (approx.) |
Trees Planted |
5 Lac (approx.) |
Grass Turfing |
62.70 Lac Sq.Mtr. |
SPEED |
|
Speed Limit for LMV |
100 Km/Hr |